System Migration
Cloud Migration
Move workloads to cloud or between clouds with target architecture, cost controls, security, cutover, and rollback.
Cloud migration changes more than compute location. Identity, networking, data, observability, licensing, cost, and the operating model all need to move deliberately.
When this service is needed
- Applications are moving from on-premises infrastructure to cloud.
- Workloads must move between regions or cloud providers.
- Current platform cost or limitations constrain growth.
- The organisation needs a landing zone and repeatable migration pattern.
Scope
- Workload discovery and per-application migration classification.
- Landing zone, networking, IAM, security baseline, and connectivity.
- Sizing, service mapping, cost model, and target architecture.
- Data replication, migration waves, rehearsal, and cutover.
- DNS, certificates, secrets, integrations, and observability transition.
- Validation, rollback, stabilisation, and legacy-resource retirement.
Migration stages
- Discovery: inventory assets, dependencies, owners, and criticality.
- Design: define the target, migration method, acceptance criteria, and rollback.
- Rehearsal: test tools, timings, data, and procedures within a controlled scope.
- Cutover: execute the move through checklists and escalation paths.
- Validation: prove function, integrity, security, and performance.
- Stabilisation: monitor outcomes, remediate findings, and retire legacy systems.
Deliverables
- Inventory and dependency map.
- Migration runbook, cutover plan, and rollback plan.
- Test and reconciliation evidence.
- Target-environment documentation and decommission plan.
Intended outcomes
Workloads reach the target cloud with dependencies preserved, costs visible, security controls active, and the new operating process documented.